Mills Fleet Farm

 

Mills Fleet Farm in Waukee was built in conjunction with Miron Construction located in Cedar Rapids, Iowa. Sitework started in March 2019 and was completed in June 2020. The building is a prototype design featuring, a 187,000 square foot building, along with an outdoor yard containing lumber, plants and other building materials. Sitework designed by ISG Engineering features a Bio-cell Filtration Basin to improve water quality along with two other detention basins onsite. Site utilities include sanitary sewer, storm sewer and water services.

 
Brief Listing of Quantities:
  • 70,000 CY Cut/Fill
  • 38,000 SY Paving
  • 218,000 SF Site Logistics Area
  • 1,500 LF Sanitary Sewer
  • 6,800 LF Storm Sewer
  • 3,100 LF Water
Portland Cement incorporation was utilized onsite for the major entrance road, building pads and crane roads per McAninch’s recommendation to accelerate the site schedule. The utilization of cement allowed for site paving, precast wall erection and steel deliveries to be performed without weather delays. This recommendation allowed for the Precast Erection contractor to start 4 weeks ahead of the original start date.